We provide design-build services for a neutral host distributed antenna system (DAS) installation site at North Carolina State University’s Carter-Finley Stadium. Our services included project management, engineering, permitting, and construction. These construction services included the installation of the base transceiver station (BTS), power cabinet, cabling to the radios, and integration. Due to a short construction timeline, we installed all equipment cabinets and cabling inside the shelter at an offsite location. The fully loaded 72,000-pound shelter was then transported to the project site, which allowed for a compressed schedule to meet the project deadline.