We performed design and construction phase services, including improvement and refurbishment of finishes in the public spaces and courtrooms, renovations of interior spaces and courtrooms, and a replacement of the building systems. The scope included replacement of all mechanical, electrical, and plumbing systems; removal and replacement of all ceilings and light fixtures; compliance of public areas with Federal Accessibility Standards; and correction of egress deficiencies. The building integrates numerous green strategies, such as the installation of photovoltaic and solar thermal systems on the rooftop of the office building. Work was performed while the building was fully occupied. Court operations were able to proceed uninterrupted during construction.
Additional services provided for the project included architecture, interior design, geotechnical engineering, construction administration, sustainable design, and signage/wayfinding.
Owner
General Services Administration
Square Footage
370,000 SF (office building); 100,000 SF (courthouse)
Cost
$70 million