Our final design included innovative safety measures such as a high-friction surface treatment-a special asphalt mix that enhances traction-and a beveled pavement "safety edge" making vehicles less susceptible to road-departure crashes. Discussions with the Seneca Nation of Indians identified aesthetic treatments that evoked the region's Native American heritage and detailed construction sequencing maintained canoe and boat traffic through the project area during bridge erection. Finally, prior to construction, the endangered mussels within the causeway footprint were relocated to other suitable habitats within Pennsylvania and several other states.
Owner
PennDOT District 1-0
Awards
Outstanding Achievement
Association for Bridge Construction and Design
Cost
$24.2 million (construction)