The facility was upgraded from 2.17 millions of gallons per day (MGD) to 3.5 MGD and included the design of an effluent gravity outfall sewer. Other upgrades included a new headworks structure, oxidation ditch, clarifier, tertiary filter, disinfection equipment, plant instrumentation, sludge return station, outfall structure, and the renovation of an existing secondary clarifier with new mechanical equipment. Additionally, we completed the planning, funding, design, and construction administration services for a million gallon equalization tank, which provides the city with operational flexibility to reduce peak flows during wet weather events.